Tecniche di risk management per l’industria delle costruzioni

Journal title PROJECT MANAGER (IL)
Author/s Alessandro Gnaldi
Publishing Year 2021 Issue 2021/47 Language Italian
Pages 7 P. 38-44 File size 368 KB
DOI 10.3280/PM2021-047008
DOI is like a bar code for intellectual property: to have more infomation click here

Below, you can see the article first page

If you want to buy this article in PDF format, you can do it, following the instructions to buy download credits

Article preview

FrancoAngeli is member of Publishers International Linking Association, Inc (PILA), a not-for-profit association which run the CrossRef service enabling links to and from online scholarly content.

  1. [1] Amato R., Chiappi R. (2009). Tecniche di project management. Pianificazione e controllo dei progetti, Franco Angeli
  2. [2] Bragadin M.A. (2011). La programmazione dei lavori con i metodi reticolari. Metodi e strumenti di project time management per la costruzione, Maggioli Editore [3] Nepi A. (2007). Project risk management. Analisi e gestione dei rischi di progetto, Franco Angeli
  3. [4] AA.VV. (2015). A guide to the project management body of knowledge 5thed., PMI
  4. [5] Bignami L. (2016). Le tecniche di risk management per i progetti di costruzione: il caso studio della riqualificazione e recupero funzionale dell’Ex-Manifattura Tabacchi per la realizzazione del Tecnopolo di Bologna, Università di Bologna
  5. [16] BS 31100, Risk management – Code of practice and guidance for the implementation of ISO 31000, 2011
  6. [15] EN 31010, Risk management – Risk assessment techniques, 2010
  7. [14] ISO 31000, Risk management - Guidelines, 2018
  8. [13] UNI ISO 21500, Guida alla gestione dei progetti, 2013
  9. [12] Vieno N. (2011). Risk Management in creating a new product, Università degli studi di Padova
  10. [11] Szymanski P. (2017). “Risk Management in construction projects”. Paper from 2nd International Joint Conference on Innovative Solutions in Construction Engineering and Management, Procedia Engineering, no. 208
  11. [10] Keshk A., Maarouf I., Annany Y. (2018). “Special studies in management of construction project risks, risk concept, plan building, risk quantitative and qualitative analysis, risk response strategies”. Paper from Alexandria Engineering Journal, no. 57
  12. [9] El-Karim M., Nawawy O., Abdel-Alim A. (2017). “Identification and assessment of risk factors affecting construction projects”. Paper from HBRC Journal, no. 13
  13. [8] Dziadosz A., Rejment M. (2015). “Risk analysis in construction project - chosen methods”. Paper from Procedia Engineering, no. 122
  14. [7] De Luca L. (2012). Utilizzo del software “Microsoft Project” nel Project Management, Università degli studi di Padova
  15. [6] Chapman R.J. (2001). “The controlling influences on effective risk identification and assessment for construction design management”. Paper from International Journal of Project Management, no.19

Alessandro Gnaldi, Tecniche di risk management per l’industria delle costruzioni in "PROJECT MANAGER (IL)" 47/2021, pp 38-44, DOI: 10.3280/PM2021-047008